meeting_logo
EU_cofunded
Home
Information
Partners
Research
Activities
Results
1st Workshop
2nd Workshop
Staff News
Activities

To better understand the evolution of the project, all the research lines will be developed following the three main group of activities (Planning, Selection and Evaluation). Planned duration of the actions is till 30.06.2008. for Italian partners, i.e. 15.09.2008. for Croatian partners. Listed activities are related to the research lines as indicated in the table below.

 Detailed activity descriptions (DOWNLOAD PDF LINK).
 The duration and action plan (DOWNLOAD PDF LINK).

Activity no. Activity title Research line no.
Activity 1
1.1
1.2
1.3
1.4
Planning
Kick-off meeting in Molise
Review of existing literature
Defining guidelines
Mid-term meeting

RL1, 2, 3, 4, 5
RL1, 2, 3, 4, 5
RL1, 2, 3, 4, 5
RL1, 2, 3, 4, 5
Activity 2
2.1
Selection
Testing sites selection

RL1, 2, 3, 4, 5
Activity 3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8

3.9

3.10

3.11
3.12
3.13

3.14

3.15

3.16

3.17
3.18
3.19
Evaluation
Seismic source characterization
Historical seismicity
Seismic wave propagation characterization
Estimation of the expected seismic motion
Collecting historical data and results from prior testing
Geological characterization and mapping
Execution of ad hoc geotechnical investigation
Preparation of seismic zonation maps (motion amplification, liquefaction, slope instability)
Integrated geophysical surveys by means of a multi-sensor system
Application of algorithms for simultaneous processing of data
Use of a topographic imaging
Behaviour of geotechnical structures under seismic loadings 

Shear strengthening of masonry panels with advanced composite materials
Strengthening of masonry arches and vaults with advanced composite materials
Masonry columns confinement with advanced composite materials
Definition of the layout of the industrial plants and  the actions
Behaviour of industrial plants under seismic loadings
Mitigation of the seismic effects on the industrial plants
Final meeting in Molise and Dubrovnik

RL1, 2, 3, 4, 5
RL1, 2, 3, 4, 5
RL1, 2, 3, 4, 5
RL1, 2, 3, 4, 5
RL2, 3, 5
RL2, 3, 5
RL2, 3, 5

RL2, 3, 5

RL4

RL4
RL4
RL1, 2, 4

RL4

RL4

RL4

RL1
RL1
RL1
RL1, 2, 3, 4, 5

university_molise


university_Lecce


NRC

RGN_logo






meeting

For questions & suggestions about this site please contact: meeting.rgn@rgn.hr